Contracted Report 2002-483-440

Lower Trinity River sediment delivery, transport, and channel change and Galveston Bay sediment monitoring

By: Dr. Michael C. Slattery, Texas Christian University

This is a 5 year study comprised of the following reports:

  • Year 1 (May 2003) - Sediment delivery and channel change on the Lower Trinity River, Texas
  • Year 2 (March 2004) - Quantifying sediment transport and delivery on the Lower Trinity River, Texas
  • Year 3 (March 2005) - Quantifying sediment transport and delivery on the Lower Trinity River, Texas
  • Year 4 (September 2006) - Downstream trends in Discharge, Slope, and Stream Power in the Lower Trinity River, Texas
    note: This year 4 report is also a report of the Coastal Coordination Council
  • Year 5 (June 2007) - Sediment monitoring in Galveston Bay - Final Phase with Jonathan D. Phillips
Top