Contracted Report 0704830699 Nueces River Authority | April 2009
Region N, Coastal Bend 2011 Regional Water Plan Region-Specific Studies
- Study 1 - Evaluation of Additional Potential Regional Water Supplies for Delivery through the Mary Rhodes Pipeline, Including Gulf Coast Groundwater and Garwood Project
- Study 2 - Optimization and Implementation Studies for Off-Channel Reservoir
- Study 3 - Implementation Analyses for Pipeline from CCR to LCC, Including Channel Loss Study Downstream of Choke Canyon Reservoir
- Study 4 - Water Quality Modeling of Regional Water Supply System to Enhance Water Quality and Improve Industrial Water Conservation
- Study 5 - Region-Specific Water Conservation Best Management Practices (BMPs)