Contracted Report: Trans-Texas Water Program Reports
Trans-Texas Water Program North Central Study Area February 1998
- Phase II Report Volume 1 - Integrated Water Supply Plans
- Phase II Report Volume 2 - Population, Water Demand Projections & Water Supply Alternatives
Interbasin Water Transfers January 22, 1996
Trans-Texas Water Program Southeast Study Area
- Contractual Transfers, March 24, 1998
- Desalination Report, February 20, 1998
- Engineering Analysis of the Interbasin Transfer Strategy, April 1998
- Enhanced Public Participation, August 14, 1995
- Environmental Analysis for the Neches Salt Water Barrier Beaumont, TX, April 1998
- Environmental Analysis of Potential Transfer Routes, April 1998
- Equity Issues Related to Water Transfers, January 16, 1998
- Galveston Bay Freshwater Inflows Study, April 22, 1998
- Impact of Potential Toledo Bend Operational Changes, April 1998
- Operation Studies and Opinions of Cost for Allens Creek Reservoir, April 1997
- Southeast Area Phase I Report, March 1994
- Phase II Program Update, September 30, 1996
- Phase II Report, April 22, 1998
- Planning Information Update, September 27, 1996
- Projected Water Needs and Supply of the Upper Neches and Sabine River Basin, April 1998
- Status of Environmental Issues for Allens Creek Reservoir, April 1997
- System Operation of Surface Water Supply Sources in the Houston Area, April 1998
- Wastewater Reclamation, March 19, 1998
- Water Conservation, January 30, 1998
Trans-Texas Water Program Corpus Christi Study Area
- Phase II Report, September 1995
Trans-Texas Water Program Austin Study Area
- Phase I Interim Report, August 1994
Trans-Texas Water Program West Central Study Area
-
Public Participation/Stakeholder Involvement Process
- Technical Memorandum, January 1996
- Issues Document, February 1997
- Phase II Edwards Aquifer Recharge Analyses, March 1998
- Water Issues Survey Report, July 1996
- Evaluation of Alternative Instream and Bay and Estuary Flow Criteria for Run-of-the-River Diversions, June 1995
- Phase I Interim Report
- Phase II Guadalupe-San Antonio River Basin Environmental Criteria Refinement, March 1998
- Phase II Guadalupe-San Antonio Model Modifications and Enhancements, March 1998
- Phase II Population, Water Demand, and Water Supply Projections, March 1998
- Phase II Updated Evaluation of Potential Reservoirs in the Guadalupe River Basin, March 1998
- Phase II Summary Report of Water Supply Alternatives, March 1998
Maintained by Communications Division