Upflow Calcite Contactor Design
Project Summary:
Permeate produced during desalination of brackish groundwater by reverse osmosis is corrosive in nature. One option to stabilize this permeate is to pass it through calcite contactors. This study will develop a design criteria for using upflow calcite contactors in the desalination process.
- TWDB Contract Manager:
- Saqib Shirazi, Ph.D., P.E.
- Funding Recipient:
- Carollo Engineers Inc.
- Project Administrator:
- Paul Walker, P.E.
- Participants:
- None
- Project Start Date:
- May 2010
- Project Completion Date:
- April 2012
- Total Project Cost:
- $211,091
- TWDB Share of Project Cost:
- $188,403
- Benefits:
- This project will develop design criteria for upflow calcite contactors for brackish groundwater desalination.
Project Details
Participants
Project Sponsors:
Texas Water Development Board
Dr. Saqib Shirazi - Contract Manager
1700 N. Congress Avenue
Austin, TX 78711
512-463-7932
Funding Recipient:
Carollo Engineers Inc.
8911 Capital of Texas Highway North
Suite 2200
Austin, Texas 78759
Project Manager:
Carollo Engineers Inc.
Paul Walker, P.E.
8911 Capital of Texas Highway North
Suite 2200
Austin, Texas 78759
512-453-5383
Project Milestones
Event | Date |
---|---|
Announcement of Request for Proposals in Texas Register | December 17, 2009 |
Initial Statement of Interest received by TWDB | March 1, 2010 |
Study approved by TWDB Board | May 20, 2010 |
Contract executed | July 26, 2010 |
Progress Reports
- July-August 2011 (241 KB)
- April-June 2011 (81 KB)
- March 2011 (33 KB)
- December 2010-February 2011 (28 KB)
Final Report
- Upflow Calcite Contactor Study, April 2012 (3.45 MB)
Photographs
Courtesy of Carollo Engineers, June 2011