>> Welcome to the project
information form webinar.

00:10.066 --> 00:14.556
Today we will be presenting a walkthrough
of the project information form

00:14.926 --> 00:17.086
in the online application system.

00:21.056 --> 00:27.606
The online application or OLA, project
information form, PIF, is a document issued

00:27.606 --> 00:32.426
by the Water Development Board to capture
information about an entity's proposed project

00:33.036 --> 00:36.746
and it's used for clean water and
drinking water state revolving funds.

00:38.016 --> 00:40.346
There are two methods to submit a PIF.

00:40.346 --> 00:43.716
Through a Word document or
the online application.

00:45.066 --> 00:47.596
Today we are covering the online version.

00:49.026 --> 00:53.786
Once your PIF is submitted, it will be
reviewed by staff to verify eligibility.

00:54.736 --> 00:59.186
Staff will rate, rank, and add your
project to the project priority list.

01:00.266 --> 01:03.516
The rating and ranking will capture
any principal loan forgiveness

01:03.956 --> 01:07.406
which you indicate you're
eligible for and you will be added

01:07.406 --> 01:11.736
to the selected state fiscal year you
opted for in the dropdown window below

01:12.936 --> 01:14.956
which is indicated by the arrow at the bottom.

01:15.636 --> 01:18.866
You may submit a PIF anytime
throughout the year.

01:22.216 --> 01:26.586
If this is the first time using the online
application, then you will need to register.

01:26.996 --> 01:28.556
Registration is quite easy.

01:29.496 --> 01:31.726
Username is your email address.

01:32.306 --> 01:36.256
All PIF's and applications created under
that email address will stay assigned.

01:37.126 --> 01:39.456
Your password requirements are listed here.

01:40.456 --> 01:44.406
Please make sure you enter the
contact information as requested.

01:44.406 --> 01:50.756
For your convenience, we do provide a link to
the Water Development Board's funding program

01:51.126 --> 01:54.876
as well as to our paper applications
which could be illustrated

01:54.876 --> 01:56.456
by the arrows on the left-hand side.

01:57.576 --> 01:59.786
You will also see the link to the OLA.

02:03.136 --> 02:04.856
This is the OLA dashboard.

02:05.576 --> 02:08.686
When you first register and log
in, your dashboard will be blank.

02:09.456 --> 02:14.776
Once you initiate a PIF, your dashboard will
populate with the PIF's you are working on

02:14.776 --> 02:18.756
and it will show your application
for what you have an assigned role.

02:19.176 --> 02:22.946
You will notice that the project
information form is located on top

02:23.216 --> 02:25.346
and the applications are located in the bottom.

02:27.866 --> 02:32.696
The PIF allows for three assigned roles, the
applicant, the contributor, and the viewer.

02:34.076 --> 02:38.476
The applicant is in control of the PIF and
can add or delete a contributor and a viewer.

02:39.506 --> 02:43.596
As indicated here, if an
applicant wishes to add a new user,

02:43.686 --> 02:46.656
an email address [inaudible] must be entered.

02:47.826 --> 02:52.036
The applicant decides whether they want to grant
the contributor permission to submit a PIF.

02:54.826 --> 02:59.466
This table provides details on specific
actions each participant can take.

03:00.776 --> 03:07.266
As you can see, the applicant has absolute
control and is able to create, edit, assign,

03:07.696 --> 03:16.646
view, submit and un-submit a PIF, view status,
audit, assign one or more users to the PIF,

03:16.646 --> 03:21.846
grant submit privileges, save
in PDF format, and roll forward.

03:23.276 --> 03:25.996
Some of you may not be familiar
with the term roll forward.

03:26.566 --> 03:31.486
This is the ability to move the PIF from one
state fiscal year to the next state fiscal year.

03:32.186 --> 03:35.826
Your PIF must be in the intended use
plan in order for you to do that.

03:35.876 --> 03:42.266
The contributor can edit and assign
PIFs, view the PIF, and its status,

03:43.096 --> 03:47.326
submit a given permission,
audit, and save as PDF.

03:47.326 --> 03:52.756
And the viewers only function is
viewing the PIF and viewing the status.

03:54.446 --> 03:57.066
We do recommend that you
coordinate the data entry.

03:57.696 --> 04:02.266
In order to save your data, please make sure
only one person is working on it at a time,

04:03.076 --> 04:05.456
otherwise some of your information
might not be saved.

04:05.456 --> 04:11.916
If you require assistance in assigning roles,
board staff is available to provide guidance.

04:15.066 --> 04:18.316
Here we have a side by side
comparison for clean water

04:18.316 --> 04:22.146
and drinking water SRF, which
are the two program types.

04:22.776 --> 04:25.366
To date, we're not covering the third selection,

04:25.656 --> 04:29.336
the State Water Implementation
Fund for Texas, also known as SWIF.

04:29.856 --> 04:33.776
We do have a webinar available on our website
if you are interested in that program.

04:33.866 --> 04:36.176
It will show you how to fill
out that application.

04:37.606 --> 04:43.076
The program selection type is based on your
proposed project which was mentioned in the PIF.

04:43.076 --> 04:46.186
Once you have a program type,
then you select a category.

04:46.186 --> 04:53.126
For the clean water SRF, your categories
include publicly owned statement works,

04:53.726 --> 04:56.986
non-point source pollution
control, and estuary management.

04:56.986 --> 05:03.846
For drinking water SRF, your categories are
public water system and source water protection.

05:04.386 --> 05:09.036
On the clean water SRF site,
you have an additional question.

05:09.566 --> 05:12.656
What type of entity is your
water and or wastewater system?

05:13.386 --> 05:14.736
You are given four options.

05:15.516 --> 05:21.076
Political subdivisions of the state which are
municipalities, counties, or special districts,

05:21.736 --> 05:26.456
a non-profit organization which include
water supply or source service corporation,

05:27.256 --> 05:29.256
a private service provider or other.

05:30.906 --> 05:35.616
When you complete your selections, questions
will be generated based on the program type,

05:36.026 --> 05:41.326
category, and type of entity, and certain
fields will be automatically populated

05:41.326 --> 05:44.906
with required data for that
specific program and category.

05:46.666 --> 05:51.646
A warning message will appear any time you
attempt to change the program type or category.

05:51.646 --> 05:56.386
If you do, then all the data you
previously entered will be erased.

05:59.156 --> 06:02.386
General information requires
the name of the entity.

06:02.476 --> 06:04.606
A dropdown menu appears.

06:05.206 --> 06:08.336
Please select the entity if it
shows up in the dropdown menu.

06:08.336 --> 06:13.396
If one does not appear, enter
under new entity column.

06:14.356 --> 06:17.026
A dropdown menu appears for the county as well.

06:17.026 --> 06:25.866
If you are submitting a drinking water PIF,
you enter the PWS ID number and the certificate

06:25.866 --> 06:29.326
of convenience and necessity
number also known as CCM.

06:30.876 --> 06:34.176
If you are an entity that has
access or programs in the past,

06:34.846 --> 06:39.866
when you assign the entity it will autofill
for both your entity and your engineer contact.

06:39.966 --> 06:43.816
If not, then enter the required
information for both.

06:45.336 --> 06:49.686
The engineers listed should be
the ones associated with your PIF.

06:49.686 --> 06:52.306
At the bottom, you have a make changes button.

06:53.196 --> 06:57.856
Clicking this button will allow you to
change information on contacts; however,

06:57.856 --> 07:01.576
it will delete any prior
information that was previously saved.

07:01.576 --> 07:08.736
A map of the service area is
required and can be uploaded here.

07:09.506 --> 07:12.466
Population figures are obtained
from the US Census

07:12.466 --> 07:16.066
through the American communities
surveyed by the year estimate.

07:16.066 --> 07:20.306
You will notice that the ACS is underlined.

07:20.306 --> 07:24.646
If you click, you will be directed
to the US Census data page.

07:24.956 --> 07:30.276
It is located at the upper right-hand
corner of your screen with an arrow.

07:30.276 --> 07:36.386
Notice that the incorporated
entities, you enter a population

07:36.386 --> 07:41.096
within your service area both
residential and non-residential; however,

07:41.096 --> 07:46.516
for your unincorporated areas, you must provide
a map that shows a population within each block.

07:48.216 --> 07:50.886
As indicated here, you can get examples online.

07:51.466 --> 07:54.096
The map of the population
is overlaid the census data.

07:55.426 --> 07:59.306
Make sure you enter both the population
served and total household connections.

07:59.636 --> 08:02.756
That is illustrated by the double
arrows at the bottom of your screen.

08:06.336 --> 08:08.916
If you're seeking financing for construction,

08:09.126 --> 08:13.656
we need to know if you previously received
a commitment for planning, acquisition,

08:13.966 --> 08:20.106
and or design within the last five years
from an SRF or [inaudible] of a PIF due date,

08:20.686 --> 08:22.616
and if other requirements were met.

08:23.696 --> 08:25.426
The requirements are as follows.

08:27.056 --> 08:31.056
The entity has completed and received
board completion approval for all

08:31.056 --> 08:34.716
of the PAD activities and is ready
to proceed to the construction phase.

08:35.966 --> 08:40.206
The board has released from
escrow at least 80% of the PAD

08:40.296 --> 08:44.376
and the project has not previously
received any board funding for construction.

08:49.786 --> 08:51.336
Moving onto project description.

08:51.866 --> 08:53.096
Enter your project name.

08:53.256 --> 08:56.446
This is the name you will call your
project and it will not change.

08:57.626 --> 09:00.076
Here you see we ask for two descriptions.

09:00.686 --> 09:05.246
One is short which is two to three sentences,
and then we ask for a longer description.

09:05.246 --> 09:08.866
In the longer description, you
will provide a lot more details

09:08.866 --> 09:13.216
to describe what your proposed project
is and what you wish to accomplish.

09:14.036 --> 09:16.746
You will need to tell us an address,

09:16.746 --> 09:20.556
the items in the rating criteria
sections that have a yes response.

09:22.506 --> 09:28.466
We do realize that sometimes entities experience
issues related to violations and enforcements

09:28.466 --> 09:31.076
and these sometimes have
health compliance challenges.

09:31.616 --> 09:35.356
We ask that you submit any
documentation associated with violations

09:35.356 --> 09:40.436
and enforcement actions as well as any
documented health compliance issues.

09:41.646 --> 09:45.626
Make sure you answer if you
are seeking emergency relief.

09:45.626 --> 09:50.366
And the proposed project is
the result of a disaster.

09:50.416 --> 09:53.296
Describe any public health
or water quality problems.

09:54.006 --> 09:59.746
Because of the disaster that will be
addressed, excuse me, by your proposed project.

10:02.816 --> 10:05.556
If you have a drinking water SRF PIF,

10:05.826 --> 10:10.266
you are required to indicate cost
categories associated with your project.

10:11.186 --> 10:14.376
The selection of cost categories
will impact the availability

10:14.376 --> 10:17.206
of choices on the estimated costs table.

10:18.196 --> 10:23.536
These categories include transmission
and distribution, source, storage,

10:24.016 --> 10:30.436
purchase of system, restricting, land
acquisition, source protection, and other.

10:30.436 --> 10:35.126
If applicable, make sure you answer
the urgent need question at the bottom.

10:37.356 --> 10:42.276
This is a snapshot example of
POTW under the Clean Water SRF

10:42.276 --> 10:43.826
which is one of the project categories.

10:44.236 --> 10:48.036
The rating criteria sections and
questions are based on your selection

10:48.036 --> 10:51.546
of the program type, category,
and type of entity.

10:52.116 --> 10:54.616
Please review your questions
and answer accordingly.

10:55.156 --> 11:00.576
Make sure you attach any required documentation
in PDF format to support your answer.

11:01.576 --> 11:05.876
These rating criteria questions are used
for the rating of the intended use plan

11:06.076 --> 11:07.826
for the project information form.

11:09.186 --> 11:13.076
Here is a snapshot example of
Drinking Water SRF criteria.

11:14.076 --> 11:18.696
Once again, the rating criteria sections
and questions are based on your selection

11:18.696 --> 11:20.496
of the program type and category.

11:21.306 --> 11:23.866
Please review your questions
and answer accordingly.

11:24.586 --> 11:29.706
Make sure you attach any required documentation
in PDF format to support your answer.

11:30.576 --> 11:34.696
These rating criteria questions are
used for rating on the intended use plan

11:34.806 --> 11:36.496
for the project information form.

11:38.766 --> 11:42.216
If your proposed project benefits
any other public water system,

11:42.246 --> 11:43.806
you need to complete this section.

11:44.566 --> 11:47.476
You will then be taken to a
consolidation project screen.

11:47.476 --> 11:52.786
If you have multiple systems, you
must enter each one separately.

11:52.786 --> 11:57.156
You will also need to provide a
written agreement with each PWS

11:57.156 --> 11:59.536
that the entity proposes to serve.

12:02.706 --> 12:07.106
The consolidation project PWS requires
you to enter a population served,

12:07.696 --> 12:12.026
number of connections, and what percentage of
the system's water does the entity provide?

12:12.586 --> 12:15.926
That is indicated on the top portion
of your screen with an arrow.

12:17.116 --> 12:20.856
The consolidation checklist has 11
questions with yes or no responses.

12:24.086 --> 12:29.686
Additional rating requirements or
rating criteria questions are pertinent

12:29.686 --> 12:34.236
to those entities that are
submitting a PIF for Clean Water SRF.

12:34.236 --> 12:38.556
Will the majority of the funds be requested
from the SRF for the project be used

12:38.556 --> 12:42.886
to implement innovative approaches
to manage, reuse, treat,

12:43.416 --> 12:47.066
or recapture stormwater, or
subsurface drainage water?

12:47.936 --> 12:52.356
And will they be used to
reuse or recycle wastewater,

12:52.556 --> 12:55.396
stormwater, or subsurface drainage water?

12:58.606 --> 13:01.386
Effective management is considered
for all projects.

13:01.546 --> 13:05.806
I want to highlight the note in this
section which states that the information

13:05.806 --> 13:09.156
that is not submitted as
requested will not be considered,

13:09.746 --> 13:13.916
and that is noted on the top portion
of your screen with an arrow.

13:15.006 --> 13:19.136
I recommend you submit all information
and documents requested for your project.

13:20.886 --> 13:23.186
The first question relates to asset management.

13:23.236 --> 13:27.686
If your entity has one, it must
meet the five year timeframe

13:28.026 --> 13:34.556
and it must address the incorporation of
an inventory that includes all your assets,

13:34.936 --> 13:41.596
assessment of the condition of the assets,
capital project priority needs, and a budget.

13:42.506 --> 13:45.076
Once again, you will see a note indicating

13:45.176 --> 13:51.786
that a capital improvement plan does not
constitute an assessment management plan.

13:51.786 --> 13:55.296
If you've had an asset management
training plan for your entity

13:55.296 --> 13:57.506
and its employees, please indicate so.

13:59.876 --> 14:03.956
If you have not done a plan and you are
seeking assistance, the Texas Commission

14:03.956 --> 14:07.486
on Environmental Quality provides
help through its financial,

14:07.486 --> 14:09.756
managerial, and technical contractors.

14:10.396 --> 14:16.116
You will find TCEQ's contact telephone and email
here for additional information and it is noted

14:16.116 --> 14:18.246
through the arrow in the
midsection of your screen.

14:21.516 --> 14:23.236
Moving along with effective management.

14:24.286 --> 14:28.066
Will your proposed project identify
and address goals, measures,

14:28.156 --> 14:31.846
or targets in a water conservation
or drought contingency plan

14:31.846 --> 14:34.296
that has been adopted by your entity?

14:35.036 --> 14:37.016
The plan must meet the five-year timeframe.

14:37.016 --> 14:40.126
If you need additional assistance
or have questions,

14:40.126 --> 14:43.396
our water conservation team
will be glad to assist.

14:44.426 --> 14:47.486
You will see an email address and
link associated with our team,

14:48.256 --> 14:51.796
and if you are seeking information
regarding drought contingency plans,

14:51.966 --> 14:55.536
you can click on the TCQ link provided here.

14:56.936 --> 14:59.896
Both are illustrated by the
arrows in the middle of the page.

15:01.726 --> 15:05.076
If your project is seeking
funding above 500,000,

15:05.076 --> 15:11.486
you will have to submit a water conservation
plan during the application phase.

15:11.486 --> 15:13.346
Moving along to energy efficiency.

15:14.366 --> 15:15.266
Reclaim water.

15:15.686 --> 15:18.336
Does the proposed project
involve a user reclaim water?

15:18.726 --> 15:22.946
That question is associated
only for Drinking Water SRF.

15:22.946 --> 15:24.076
Energy efficiency.

15:24.546 --> 15:27.656
Does the proposed project address
a specific goal in a statewide

15:27.656 --> 15:31.586
or plant-wide energy assessment
audit or optimization study

15:31.586 --> 15:33.886
that has been conducted within
the past three years?

15:34.506 --> 15:38.506
This question applies to both
Drinking Water and Clean Water SRF.

15:41.306 --> 15:44.186
The next question relates to
implementation of water plan.

15:44.186 --> 15:48.876
If your project incorporates any
of the following plans, mark yes.

15:50.106 --> 15:55.476
As indicated here, the various plans
are state or regional water plan,

15:56.076 --> 16:00.456
water shed production plan, integrated
water resource management plan,

16:00.916 --> 16:05.096
regional facility plan, regionalization
or consolidation plan,

16:05.096 --> 16:09.766
finalized economically distressed
areas program facility plan,

16:10.736 --> 16:13.696
or a total maximum daily
loads implementation plan.

16:17.176 --> 16:20.206
If you have green component to
your project, please indicate here.

16:21.426 --> 16:26.366
We do provide green project reserve guide that
is very useful and can assist you and is noted

16:26.856 --> 16:29.266
on the arrow on the upper right-hand corner.

16:29.926 --> 16:34.446
You can access the guide by
clicking on the TWDB-1061.

16:34.446 --> 16:37.596
If your project is green, click yes.

16:37.596 --> 16:39.976
You will need to enter an estimated cost

16:39.976 --> 16:42.576
and justify the green elements
of your proposed project.

16:42.636 --> 16:47.906
As many of you know, we offer refinancing.

16:48.476 --> 16:54.296
We can refinance existing debt from any other
funding source if it is related to this project;

16:54.986 --> 16:59.336
however, the board cannot refinance
existing debt service associated

16:59.586 --> 17:01.816
with any other board financial assistance.

17:01.816 --> 17:08.546
If you answer yes, you will get an upload box
that require documentation eligibility criteria.

17:10.956 --> 17:14.286
The board funds several phases of
a project which include planning,

17:14.286 --> 17:16.386
acquisition, design, and construction.

17:17.326 --> 17:21.696
There are entities that by the time you submit
a PIF, they're ready to move to construction.

17:21.696 --> 17:27.756
For permitting questions, please let us
know if you have all the indicated permits.

17:27.826 --> 17:33.326
If your PIF is for clean water
SRF, then you must verify

17:33.326 --> 17:38.916
that you have a wastewater discharge permit
for a wastewater treatment plan construction

17:39.266 --> 17:41.456
or wastewater reuse authorization.

17:41.456 --> 17:46.486
You will also need to have all the land
acquisition and easements required.

17:49.426 --> 17:53.266
For the design questions, please let us
know where you're at in the design phase.

17:53.396 --> 18:00.326
For your convenience, we indicate what documents
are needed for a completed preliminary study.

18:02.176 --> 18:04.756
That is indicated with an
arrow in the midsection.

18:06.446 --> 18:11.176
We will also need to know if TCEQ has approved
plans and specifications for your project.

18:16.246 --> 18:18.496
Since the state revolving
fund is federally funded,

18:18.496 --> 18:20.726
certain environmental requirements must be met.

18:21.466 --> 18:25.516
In this section, you are given
four environmental review options.

18:26.046 --> 18:28.426
Select the options that applies to your project.

18:28.816 --> 18:30.386
You're only allowed one selection.

18:30.386 --> 18:35.786
You will notice that we provide links to the
Texas Administrative Code for your convenience,

18:35.866 --> 18:39.356
and those are noticed by the double
arrow in the midsection of your screen.

18:42.356 --> 18:43.916
Moving onto the construction phase.

18:43.986 --> 18:46.686
If you're ready to move onto construction,

18:47.186 --> 18:50.026
give us an estimated start
date and a completion date.

18:51.496 --> 18:55.476
If your entity is ready to start
construction, will you be ready to advertise

18:55.476 --> 18:58.086
and bid out your project once we award funds?

18:59.186 --> 19:03.866
Also, if you seek reimbursement for
eligible planning and or design,

19:04.416 --> 19:07.926
you must comply with federal
regulations known as cost cutters.

19:08.456 --> 19:12.056
Here we mention procurement following
the disadvantaged business enterprise.

19:12.056 --> 19:18.616
For information, you can click on the
underlying DBE which is noted by the arrow

19:18.616 --> 19:24.306
on the midsection to the left side, and
also, tell us how many months will it take

19:24.306 --> 19:27.086
to close your loan once the
board has committed funds.

19:30.006 --> 19:33.266
Estimated costs are associated with
your program type and category.

19:33.916 --> 19:38.396
Make sure you click the selected checkbox
that is associated with your project

19:38.396 --> 19:44.106
and carefully review each category and complete
what is applicable in terms of planning,

19:44.206 --> 19:48.776
acquisition, design, construction,
and total cost for each.

19:49.026 --> 19:54.256
And those boxes are highlighted with the
arrow on the top lefthand side of your screen.

19:54.256 --> 19:59.926
If the cost category is not enabled,
but you believe it should be,

19:59.926 --> 20:02.866
please return to the project
description to enable it.

20:05.136 --> 20:08.106
For anticipated commitment,
select the one time commitment.

20:09.176 --> 20:12.096
A stamp and signature are
required in estimated budget.

20:13.326 --> 20:16.376
You are able to download and
upload statement documents.

20:16.966 --> 20:22.636
As indicated in the PIF guidelines, if the grand
total of this project is greater than 100,000,

20:23.426 --> 20:27.146
ensure that the seal and signature of
the registered professional engineer

20:27.146 --> 20:31.236
who prepared the cost estimates
are included with the signature

20:31.236 --> 20:33.996
of the entity's authorized representative.

20:36.706 --> 20:38.906
If you are seeking disadvantaged community,

20:38.906 --> 20:42.216
you must submit all the required
information in order to be considered.

20:42.716 --> 20:47.426
As indicated, eligibility is based
on the information you provide

20:47.676 --> 20:51.186
and is subject to final review by staff.

20:51.186 --> 20:53.296
The eligibility criteria is as follows.

20:54.856 --> 21:00.516
An entity's entire portion of service
area, AMHI, annual median household income,

21:01.096 --> 21:06.636
must be less than or equal to
75% of the state's AMHI according

21:06.636 --> 21:10.176
to the most recently available
ACS five-year survey.

21:11.446 --> 21:16.906
An entity's household cost factor
must be greater than or equal to 1.0%

21:17.286 --> 21:20.126
if the service area is charged
for water or shore services.

21:20.126 --> 21:24.466
If any entity charges for
both water and shore service,

21:24.866 --> 21:28.896
the ACF must be equal to or greater than 2%.

21:30.646 --> 21:34.856
If your entity is seeking disadvantaged
community eligibility, answer yes.

21:35.166 --> 21:40.736
If not, then you will be directed to the
review section of the project information form.

21:43.876 --> 21:45.726
You will be required to upload a map

21:45.726 --> 21:49.426
of the service area whether it's
an entire area or a portion.

21:50.336 --> 21:53.576
There are two ways of submitting
disadvantaged community information.

21:54.306 --> 21:58.836
You assess this data which will
auto-generate within the OLA application,

21:58.836 --> 22:02.116
or providing a social economic data survey.

22:03.866 --> 22:09.436
Entities must request permission from the
board to perform a social economic data survey.

22:10.466 --> 22:17.786
We provide a link to the board
survey guidelines noted here.

22:17.786 --> 22:21.566
If you are using the survey, make sure
to review the guidelines for compliance.

22:22.596 --> 22:27.856
With the upcoming March due date, if you need
to conduct a survey please contact us as soon

22:27.856 --> 22:33.816
as possible as our timeline will be very tight
and the surveys must be submitted with your PIF.

22:37.616 --> 22:40.636
If you are using the survey, you
will need to complete this section.

22:41.376 --> 22:47.346
Again, you must use a board approved survey and
follow the social economic survey guidelines.

22:47.346 --> 22:52.896
For information, if you click on the underlying
words, you will be directed to the guide,

22:52.896 --> 22:56.836
and that is illustrated by the arrow on
the top righthand corner of your screen.

22:59.346 --> 23:01.866
Next, enter geographic boundary.

23:02.086 --> 23:08.176
If your source for social economic data is the
census, you will be prompted to this section.

23:08.726 --> 23:13.246
On this screen, geographic
boundaries will auto populate similar

23:13.246 --> 23:16.006
to cities on entity contact screen.

23:16.836 --> 23:22.416
Once that has been entered, you will
see auto populations done for AMHI,

23:23.116 --> 23:27.656
average household size for a
population and unemployment rate.

23:28.106 --> 23:33.456
Remember, enter the number of household
connections for your geographic area.

23:35.186 --> 23:40.326
When you enter your geographic area, the online
application will automatically let you know

23:40.326 --> 23:45.126
if your household income meets
or is over the 75% threshold.

23:46.146 --> 23:53.216
Now if your AMHI exceeds the
threshold, you will get this message,

23:53.596 --> 23:58.666
and the message says the service
area's AMHI exceeds the threshold

23:58.666 --> 24:01.546
of 75% of the state's AMHI.

24:02.426 --> 24:05.866
The entity does not qualify for
disadvantaged community funding.

24:09.836 --> 24:13.946
Water and sewer rates are
captured, or rather, entered here.

24:14.046 --> 24:18.556
If these do not apply to you, there
is an N/A button you can select.

24:19.016 --> 24:20.646
This is just an example of water.

24:21.096 --> 24:23.366
The same information is captured
for [inaudible].

24:24.076 --> 24:27.546
When you enter rate data, make sure
you enter the most recent rates.

24:27.546 --> 24:33.656
You will see that the average monthly
balance per user, average household size,

24:34.246 --> 24:38.766
and average monthly water flow per
household are auto populations based

24:39.206 --> 24:41.006
on information you provided.

24:41.096 --> 24:48.876
Like the water rate information, you will
enter applicable sewer rate information.

24:48.916 --> 24:52.376
If not, click the NA button and move forward.

24:55.056 --> 25:00.436
The estimated eligible amounts of principal loan
forgiveness are auto calculated for each entry

25:01.096 --> 25:06.206
which include annual cost, annual
loan cost per customer, unemployment

25:06.206 --> 25:12.366
and population adjustments, household cost
factor, household cost factor difference

25:12.366 --> 25:14.426
and estimated principal forgiveness.

25:14.426 --> 25:16.806
An important notification here.

25:17.546 --> 25:24.036
All the disadvantage calculations are subject
to final review and correction by board staff.

25:24.036 --> 25:28.026
And final determination will be
provided where the project is listed

25:28.026 --> 25:32.296
in the intended use plans,
project priority list.

25:35.536 --> 25:37.426
If you have additional documents and

25:37.426 --> 25:40.676
or attachments you need to
upload, you may do them here.

25:41.476 --> 25:45.176
Provide all supporting documentation in
reference to the scope of the project.

25:45.646 --> 25:48.846
As a reminder, only PDF's are allowed.

25:48.846 --> 25:53.946
In closing, this is the PIF review screen.

25:54.666 --> 25:58.536
Any information or questions not
answered, you will see this prompt screen.

25:59.246 --> 26:02.166
Clicking on any prompt will
take you directly to that page.

26:02.746 --> 26:06.806
It is very important to remember to
upload all required supporting documents.

26:07.676 --> 26:13.746
Also, to submit this documentation or any
documentation in the required PDF format.

26:17.816 --> 26:19.446
We do have plenty of staff available

26:19.446 --> 26:24.636
to help answer any questions you may have during
the [inaudible] process including ones related

26:24.636 --> 26:26.536
to filling out the PIF.

26:26.536 --> 26:29.176
On the lefthand side of your
screen, you will see contact names.

26:30.086 --> 26:32.706
Clean Water SRF contact Issa McDaniel.

26:33.226 --> 26:37.476
Drinking Water SRF contact, Caaren Skrobarczyk.

26:38.406 --> 26:41.416
State programs, Alyssa Azari.

26:42.016 --> 26:46.326
Statewide outreach team, Lee
Huntoon and Enriqueta Caballero.

26:46.326 --> 26:51.396
Our regional teams are set up to
help you from the application phase

26:51.396 --> 26:53.706
through the life of the project
and the closeout.

26:53.706 --> 26:59.606
You will also see that we provide a map of
the region that are divided geographically.

26:59.906 --> 27:01.046
We have seven teams.

27:02.116 --> 27:05.636
The seventh is statewide and the
others are geographically assigned.

27:06.176 --> 27:08.026
Within the teams, you have a team lead,

27:08.026 --> 27:11.276
and we provided a team lead
name and a contact phone number.

27:15.276 --> 27:17.276
Once again, thank you for joining us today.

27:18.016 --> 27:18.596
Have a good day.